Print Options

Card layout: ?

← Back to notecard set|Easy Notecards home page

Instructions for Side by Side Printing
  1. Print the notecards
  2. Fold each page in half along the solid vertical line
  3. Cut out the notecards by cutting along each horizontal dotted line
  4. Optional: Glue, tape or staple the ends of each notecard together
  1. Verify Front of pages is selected for Viewing and print the front of the notecards
  2. Select Back of pages for Viewing and print the back of the notecards
    NOTE: Since the back of the pages are printed in reverse order (last page is printed first), keep the pages in the same order as they were after Step 1. Also, be sure to feed the pages in the same direction as you did in Step 1.
  3. Cut out the notecards by cutting along each horizontal and vertical dotted line
To print: Ctrl+PPrint as a list

94 notecards = 24 pages (4 cards per page)

Viewing:

Walker's Building Estimator's Reference Book, 33rd Edition Questions and Answers

front 1

Some advantages to be realized when a ____________ is used to excavate is that it digs straight, vertical side walls (in soil which will stand), it cuts a level floor, and it reduces hand trim to a minimum.

back 1

Power hoe or backhoe

front 2

If an ASTM standard reinforcing bar has a diameter of 1.00 inch, then it would be classified a ____________ bar.

back 2

#8

front 3

A ____________ bond is a bond furnished by the contractor that guarantees they will sign a contract in accordance with their bid and will provide performance and payment bonds.

back 3

Bid

front 4

If #3 reinforcement bars are to be lapped a minimum of 30 times the bar diameter, the minimum length of bar lap is ____________ inches. Select the closest answer.

back 4

11.25

front 5

____________ is one of the two methods for CPM calculations.

back 5

Arrow diagramming

front 6

A standard, non-modular brick is ____________ inches long.

back 6

8

front 7

Plans and elevations are usually drawn at no less than

back 7

1/8" 1'0"

front 8

Under the Uniform System developed by the Construction Specifications Institute (CSI) Division 2 includes

back 8

Subsurface Investigation

front 9

The area of a roof measuring 100'-0" x 100'-0" with a 1⁄4 pitch and a 12" or 1' overhanging cornice is ____________ square feet. Select the closest answer.

back 9

11,632

front 10

When excavating sandy clay/moist loam using a hydraulic tractor (crawler) backhoe with a 1-1/4 cubic yard bucket, an average of ____________ cubic yards can be excavated per 8-hour day. Select the closest answer.

back 10

900

front 11

The well point method of dewatering is usually

back 11

Used in advance of the excavation

front 12

____________ board feet of wood would be required to build a partition wall that measures 8' high x 25' long and is 4" thick with one 2 x 4 sole plate but a double plate at the top. Assume studs are placed 18" on center. Select the closet answer.

back 12

146

front 13

If 450 bank cubic yards of dry sand is to be excavated, the number of loose cubic yards that will be excavated is ____________ cubic yards. Select the closet answer.

back 13

495

front 14

____________ is the material or masonry units forming a cap or finish on top of a wall and protects it from penetration of water from above.

back 14

Coping

front 15

The highest strength mortar is

back 15

Туре М

front 16

The convenience outlet symbol is defined to be a

back 16

Range

front 17

A ____________ bond is a bond assuring that the contractor will complete a project in accordance with plans and specs identified in the contract documents.

back 17

Performance

front 18

An activity with zero float is called a

back 18

Critical activity

front 19

In estimating quantities of excavation and concrete, both are measured by the cubic yard. One cubic yard contains ____________ cubic feet.

back 19

27

front 20

____________are drawings in which all horizontal and vertical lines have true length and vertical lines are vertical but horizontal lines are set at 30 degrees or -30 degrees.

back 20

Orthographics

front 21

One mason will lay an average of
____________light weight actual size 7 5/8" x 7 5/8" x 15 5/8" concrete blocks below grade in an 8-hour shift.

back 21

225-250

front 22

The ____________method of drilling can only be used for preliminary investigations for foundations.

back 22

Hand auger

front 23

Most working drawings for building construction are based on

back 23

Orthographic projection

front 24

Modular face bricks with a nominal brick size of 2 2/3" x 4" x 8" are to be used to face a 2,500 square foot wall without headers. ____________bricks will be required for this job. Select the closest answer.

back 24

16,875

front 25

____________work is usually publicly advertised.

back 25

Public

front 26

The typical dead weight of a 3/4 inch piece of form plywood is ____________ lbs.

back 26

71

front 27

A ____________ contract allows the owner control over the selection of his general contractor.

back 27

Negotiated

front 28

Once a loan is approved and accepted, ____________is (are) NOT considered a closing cost(s).

back 28

Interest

front 29

When hauling excavated materials in trucks, the truck capacity should be at least ____________times the dipper or bucket capacity of the excavator.

back 29

Four

front 30

A contractor can borrow money at 2 points above the current prime rate. This means that

back 30

The interest the contractor will be paying is 2% over the prime rate determines the quality requirements on a project during the process of bidding.

front 31

____________determines the quality requirements on a project during the process of bidding.

back 31

Specifications

front 32

A pneumatic tamper enables a worker to do nearly
____________times the work he can do by hand.

back 32

Ten times

front 33

____________is not one of the three traditional methods of construction scheduling.

back 33

Jobsite Project Schedule

front 34

Most building departments require that plumbing drawings be submitted in a/an

back 34

Isometric riser diagram

front 35

The maximum distance that can typically be spanned by a wood truss is ____________ feet.

back 35

200

front 36

A masonry unit that does not meet standards or specifications and has been rejected is known as

back 36

Culls

front 37

Any discrepancies on the plans or specifications or changes the architect or owner wish to make after the plans and specifications have been issued,

back 37

Addenda

front 38

The average life expectancy of truck tires in construction work is ____________hours.

back 38

3,000

front 39

The federal government, under the ____________ requires that a contractor furnish two separate bonds, one for performance and one for the payment of labor and materials.

back 39

Miller Act

front 40

A defect in workmanship is found 18 months after a project is completed. A ____________ bond would cover the repair.

back 40

Maintenance

front 41

If a contractor regularly operates within an area that requires a permit bond, the cost of this bond should be expensed

back 41

As office overhead

front 42

An AIA form ____________, the Contractors Qualification Statement, is used to furnish information needed to bid on public work.

back 42

A305

front 43

Another reference name for a Bar Chart is a

back 43

Gantt Chart

front 44

The terms CPM and PERT pertain to

back 44

Scheduling

front 45

The principal objective of construction scheduling is to manage all of the following resources used in the construction process except for

back 45

Cash flow

front 46

The standard tool for resource control in project scheduling which calculates the project completion date and dates for completion of project activities and intermediate milestones is the

back 46

Critical Path Method (CPM)

front 47

2600 L.F. of 2 x 4's is ____________board feet. Select the closest answer.

back 47

1,734

front 48

Equipment rental rates vary greatly throughout the country. It is standard practice to base rates on ____________ hours per month.

back 48

176

front 49

When renting non-tractor equipment, the ____________is usually responsible for the cost of repairs due to normal wear and tear.

back 49

Leaser

front 50

The type of excavating equipment selected, as well as the size of the equipment required for a project, should be based on the,

back 50

Volume of material to be moved

front 51

The average useful life of a 3/4 cubic yard hydraulic backhoe is ____________years.

back 51

7

front 52

At a density of approximately 25 pounds per cubic foot, 1" of vermiculite concrete has an insulating value equal to approximately ____________ inches of ordinary concrete.

back 52

16

front 53

The R value rating of a masonry wall constructed with 10" thick hollow concrete masonry units with a

back 53

R-7.6

front 54

The weight of 150' of 2-1/2" x 2-1/2" x 3/16" steel angles is ____________pounds. Select the closest answer.

back 54

460.5

front 55

An 8-inch light weight concrete block has an R value of

back 55

2.00

front 56

40,000 pounds will equal ____________metric tons. Select the closest answer.

back 56

18.14

front 57

A ____________ arch has horizontal or nearly horizontal upper and lower surfaces.

back 57

Jack

front 58

Information on the nature or the thickness of underlying subsurface rock is usually obtained by

back 58

Core borings

front 59

The ____________sheets in the working drawings for a project will include the site survey and grading plans.

back 59

Civil

front 60

After acquiring a piece of construction equipment, the contractor should

back 60

Develop an hourly rate charge, sufficient to cover interest charges and original investment

front 61

A blueprint shows a rectangular building lot that scales out a 15.0" by 22.5". The scale given for the site plan is 1" 12". The area of the building lot is ____________square feet. Select the closest answer.

back 61

48,600

front 62

____________is the amount of time that an activity can be delayed and is obtained by subtracting its early start (ES) from its late start (LS).

back 62

Total float

front 63

Modifications issued after contract is signed are called a(n)

back 63

Change order

front 64

Well point systems are typically used for dewatering excavations. For specific applications, the general contractor should

back 64

Consult a local dewatering contractor

front 65

According to a set of plans, a contractor is to construct a residential structure that measures 40' x 60' with a hip slope sloped at 5/12 slope. The total area of the roof is ____________ square feet. Select the closest answer.

back 65

2,600

front 66

Architects and Engineers specify that fill material is to be placed in layers from ____________inches and to compact each layer with some sort of roller or tamping equipment.

back 66

6-12

front 67

When cutting old or cured concrete, using a diamond blade of correct specification, cutting time may be ____________the amount given for cutting green concrete.

back 67

Double

front 68

The typical swell factor for an average blasted rock is ____________ %.

back 68

27

front 69

Vermiculite is a mineral that expands, when heated, to about ____________ times its original size.

back 69

12

front 70

Which of the following statements is NOT correct?

back 70

Total float is obtained by subtracting its' EF from its' ES time

front 71

Which of the following is NOT an advantage to using Tilt-up wall panel construction?

back 71

Field personnel will be unfamiliar with a new type of construction procedure, rejection and opposition will be encountered

front 72

A minor arch with a maximum span of 6 feet and a load not exceeding 1000 lb. per foot is typically referred to as a ____________ arch.

back 72

Jack

front 73

A vertical plane represented by an orthographic projection of the outside building is a (an).

back 73

Elevation

front 74

____________standard bricks are required to build an 8" thick 10 ft x 20 ft wall using a 3/8" bed joint. Select the closest answer.

back 74

2,666

front 75

If the lap is 4" wide and only a single thickness of felt is used, add about ____________% to allow for laps and the additional felt required at the top and bottom of wall.

back 75

20

front 76

A contractor is building a house with a hip roof. The slope of the roof is 5/12. The plan dimensions of the house are 40' x 60'. Assuming a 10% waster factor, the contractor should order ____________ sheets of plywood. Select the closest answer.

back 76

90

front 77

A contractor is buying a bundle of 2" x 6" x 8' long. The cost of lumber is $0.25 per BF. If the cost of the bundle is $100, ____________pieces are in the bundle. Select the closest answer

back 77

50

front 78

One of the easiest and most frequently used methods of computing grading cuts or fills for a plot plan that shows contours is the ____________ method.

back 78

Cross sectional

front 79

A contractor has to excavate a drainage swale that is 200' long, 16' wide and has a depth of 2' with the ends vertical. If the soil to be removed is mud, the total volume of material to be removed from the job site would be ____________ cyd. Select the closest answer.

back 79

285

front 80

The principal objective of a construction schedule is to

back 80

Efficiently manage resources in order to complete within the estimated time and costs for the project

front 81

The process of constructing the temporary end of a masonry wall with the end stretcher of every alternate course projecting is known as

back 81

Toothing

front 82

A shelf or ledge formed by projecting successive course of masonry out from the face of the wall, pier or column is a

back 82

Corbel

front 83

A method of construction for walls that greatly reduces the investment in large quantities of forming material is known as ____________ construction. In this method, the wall panels are cast on the ground and then raised into position.

back 83

Tilt-up

front 84

A wall built of the wythes of masonry units, separated by an air space, and tied together is known as a (an). ____________ wall.

back 84

Cavity

front 85

Another name for a major arch is a ____________ arch.

back 85

Gothic

front 86

In an ordinary building foundation work, the most common type of pile to be used is

back 86

Cast in place concrete

front 87

The late start of an activity is the

back 87

Latest it can start without effecting the end date of the project

front 88

A contractor needs to purchase 25 lengths of structural steel angle, 2 1⁄2 x 2 1⁄2 x 1/2. Each piece of 20' long. The total weight to be purchased is ____________pounds. Select the closest answer.

back 88

3,850

front 89

The type of mortar recommended to be used for stone foundation walls is

back 89

Туре М

front 90

Each of the following factors must be considered when estimating the costs for the excavation of a project. Generally, the easiest to quantify is the

back 90

Volume of material to remove

front 91

A diesel backhoe has a 175 HP engine. The estimated fuel consumption for the backhoe is between ____________ gallons per hour. Select the closest answer.

back 91

5.95 and 7.00

front 92

A contractor is operating a 225 HP backhoe. The machine is operated for 7.5 hours per shift. If the contractor is working 6 days a week and wants to size a fuel tank to give himself a one-week supply of diesel fuel, the tank would need to hold ____________ gallons. Select the closest answer.

back 92

405

front 93

A contractor is estimating the amount of roofing material to buy for a project. According to Walker's, a waste factor of ____________% would be used to estimate the quantity of asphalt shingles for a structure with hip roofs, including dormers and valleys.

back 93

20

front 94

Based on the house plan below, the total roof area is ____________ square feet Select the closest answer.

back 94

4,297