Print Options

Card layout: ?

← Back to notecard set|Easy Notecards home page

Instructions for Side by Side Printing
  1. Print the notecards
  2. Fold each page in half along the solid vertical line
  3. Cut out the notecards by cutting along each horizontal dotted line
  4. Optional: Glue, tape or staple the ends of each notecard together
  1. Verify Front of pages is selected for Viewing and print the front of the notecards
  2. Select Back of pages for Viewing and print the back of the notecards
    NOTE: Since the back of the pages are printed in reverse order (last page is printed first), keep the pages in the same order as they were after Step 1. Also, be sure to feed the pages in the same direction as you did in Step 1.
  3. Cut out the notecards by cutting along each horizontal and vertical dotted line
To print: Ctrl+PPrint as a list

187 notecards = 47 pages (4 cards per page)

Viewing:

Code of Federal Regulations (OSHA) 29 CFR 1926 Questions and Answers

front 1

The minimum distance between side rails for all portable ladders shall not be less than _______________ inches.

back 1

11 1⁄2

front 2

A stairway, ladder, ramp or other safe means of egress shall be located in trench excavations that are _______________ feet or more in depth so as to require no more than _______________ feet of lateral travel
for employees.

back 2

4; 25

front 3

Stairways that will not be a permanent part of the structure on which construction work is being performed shall have landings of not less than _______________ inches in the direction of travel.

back 3

30

front 4

Toeboards, when used as falling object protection, shall be a minimum of _______________ inches in vertical height.

back 4

3 1⁄2

front 5

Scaffold fabricated planks and platforms shall be designed for a working load of _______________ pounds per square foot (psf), if considered light duty.

back 5

25

front 6

A scaffold designed for 75 pounds per square foot (psf) is classified as _______________

back 6

Heavy-duty

front 7

An extra-heavy-duty type 1A metal or plastic ladder shall sustain at least _______________ maximum intended load.

back 7

3.3

front 8

A bricklayer's square scaffold load shall not exceed _______________pounds per square feet.

back 8

50

front 9

OSHA requires an employer to provide a "training program" for each employee_______________

back 9

Using ladders and stairways

front 10

Cord sets and receptacles which are fixed and not exposed to damage shall be tested at intervals not exceeding _______________ months.

back 10

6

front 11

When portable ladders are used for access to an upper landing surface, the ladder side rails shall extend at least _______________ feet above the upper landing surface to which the ladder is used to gain access.

back 11

3

front 12

Personnel hoistway doors or gates shall be not less than _______________ high.

back 12

6 feet 6 inches

front 13

The minimum illumination for indoor corridors during construction shall be _______________ foot-candles.

back 13

5

front 14

The span between hangers for plank-type platforms shall not exceed _______________ feet.

back 14

10

front 15

Bricklayers square scaffolds shall not exceed _______________ tiers in height.

back 15

3

front 16

Where toeboards are used for falling object protection, the toeboard shall be capable of withstanding, without failure, a force of at least _______________ pounds applied in any downward or horizontal direction.

back 16

50

front 17

Fixed ladders without cages or wells shall have a clear width to the nearest permanent object of at least _______________ inches on each side of the centerline of the ladder.

back 17

15

front 18

Rungs, cleats and steps of portable ladders (except for special applications such as stepstools) shall be spaced not less than _______________ inches apart, nor more than _______________ inches.

back 18

10; 14

front 19

Wire rope shall not be used for material handling if in any length of _______________ diameter(s) the total number of visible broken wires exceeds 10% of the total number of wires.

back 19

A. 12 B. 18 C. 10 D. 8

front 20

The minimum illumination of general construction area lighting is _______________ foot-candles.

back 20

5

front 21

All new safety nets shall meet accepted performance standards of _______________

back 21

17,500 foot-pounds minimum impact resistance B. 24,000 foot-pounds minimum impact resistance

front 22

The contents of the first aid kit shall be placed in a weatherproof container with individual sealed packages for each type of item, and shall be checked by the employer before being sent out on each job and at least _______________ on each job to ensure that the expended items are replaced.

back 22

Weekly

front 23

If the personnel hoist wire rope speed is 300 feet per minute, the minimum rope safety factor must be_______________

back 23

9.20

front 24

The use of non-self-supporting ladders shall be at such an angle that the horizontal distance from the top support to the foot of the ladder is approximately _______________ of the working length of the ladder.

back 24

One-quarter

front 25

Stairs shall be installed between _______________ and _______________ degrees horizontal.

back 25

30; 50

front 26

Each employee on walking/working surfaces shall be protected from falling through holes, including skylights, by covers capable of supporting, without failure _______________ that may be imposed on the cover at any one time.

back 26

At least twice the weight of employees, equipment and materials

front 27

Class II hazardous locations are those that are hazardous because of the presence of _______________

back 27

Combustible dust

front 28

Combustible materials shall be piled with regard to the stability of the piles and in no case shall be higher than _______________ feet.

back 28

20

front 29

OSHA requires that for a structural steel assembly, at no time shall there be more than _______________ feet or _______________ floors, whichever is less, of unfinished bolting or welding above the foundation.

back 29

48; 4

front 30

The term "ROPS" means _______________

back 30

Rollover Protective Structures

front 31

The maximum allowable slope for Type A soil for a simple slope in an excavation of 20 feet or less in depth is _______________

back 31

3⁄4 : 1

front 32

When employees are required to be in trenches of _______________
feet or more, an adequate means of egress such as a ladder, stairway or ramp shall be provided.

back 32

4

front 33

Openings are defined as a gap or void _______________

back 33

30 inches or more high and 18 inches or more wide in a wall

front 34

The top edge height of top rails, or equivalent guardrail system members, shall be _______________ inches.

back 34

42

front 35

The use of spiral stairways that will not be a permanent part of the structure on which construction work is being performed is _______________

back 35

Prohibited

front 36

One toilet shall be provided at the construction jobsite for a maximum of _______________ employees.

back 36

20

front 37

A Class C fire is a fire caused by

back 37

Electrical equipment

front 38

When materials are dropped more than _______________ enclosed chute shall be used.

back 38

20

front 39

Material shall not be stored indoors within _______________ feet outside the exterior walls of a building, an inches of a fire door opening.

back 39

36

front 40

Scaffold planking that is nominal two inches thick shall be used for a _______________ psf workload at a _______________ maximum span of _______________ feet.

back 40

25; 8

front 41

OSHA requires that a safety factor based on load and speed be used in hoist cables. The safety factor for a cable with a speed of 200 feet per minute is

back 41

8.60

front 42

Safety belt lanyards used for employee safeguarding shall have a minimum breaking strength of _______________ pounds.

back 42

5,400

front 43

The proper maintenance for a carbon dioxide type fire extinguisher is to

back 43

Weigh semi-annually

front 44

No more than _______________ gallons of flammable or combustible liquids shall be stored in a room outside of an approved storage cabinet.

back 44

25

front 45

Exposure to impulsive or impact noise shall not exceed _______________ dBA peak sound pressure level.

back 45

140

front 46

Simple slope-short-term excavations in Type A soil with a maximum depth of 12 feet shall have a maximum allowable slope of

back 46

1⁄2: 1

front 47

The ratio of the ultimate breaking strength of a piece of material or equipment to the actual working stress when in use is known as the

back 47

Safety factor

front 48

Wire, synthetic or fiber rope used for scaffold suspension shall be capable of supporting at least _______________ times the rated load.

back 48

6

front 49

The proper maintenance for a multi-purpose ABC dry chemical stored pressure fire extinguisher is to

back 49

Check pressure gauge and condition of dry chemical annually

front 50

Metal tubular frame scaffolds, including components such as braces, brackets, trusses, screws legs, ladders, etc. shall be designed, constructed and erected to safely support its own weight and at least _______________ times the maximum intended load applied.

back 50

4

front 51

The maximum span of 2" x 10" undressed lumber on a scaffold when loaded with 50 psf shall be _______________ feet.

back 51

8

front 52

On construction sites, a fire extinguisher rated not less than 2A shall be provided for each _______________ square feet of the protected building area, or major fraction thereof.

back 52

3,000

front 53

Potable drinking water, per OSHA, requires that

back 53

If a container is used it shall be equipped with a tap

front 54

A safety belt lanyard shall provide for a fall not greater than _______________ feet.

back 54

6

front 55

The maximum allowable height of a horse scaffold shall be two tiers or _______________ feet.

back 55

10

front 56

When using carpenters' bracket scaffolds, the

back 56

  • Brackets shall be spaced a maximum of 8 feet
  • Bolts used to attach shall be not less than 5/8 inches in diameter
  • Tools and materials shall not exceed 75 pounds

front 57

When a material hoist tower is not enclosed, the hoist platform shall

back 57

Be caged on all sides

front 58

Employees cannot be subjected to noise levels higher than _______________ dBA for more than four hours per day.

back 58

95

front 59

The range of maximum intended working loads for light to heavy-duty Independent Wood Pole Scaffolds shall be _______________ pounds per square foot (psf).

back 59

25-75

front 60

Safety nets shall be provided when workplaces are more than _______________ feet above the ground or water surface.

back 60

25

front 61

No more than _______________ employee(s) shall occupy any given eight feet of a form scaffold at any one time.

back 61

2

front 62

Given the following:

1 1⁄2 hours noise exposure at 90 dBA

1⁄2 hour noise exposure at 100 dBA

1/4 hour noise exposure at 110 dBA

If your employees are exposed to all of the above noise levels each workday, the "Equivalent Noise Exposure Factor

back 62

Does not exceed unity, therefore the noise exposure is within permissible limits

front 63

A fire breaks out in a main electrical junction box at a construction site, an electrician is close by and asks you to get a fire extinguisher. According to OSHA, you should bring back a _______________ extinguisher.

back 63

CO2

front 64

Oxygen cylinders, regulators and hoses shall be

back 64

Kept away from oil or grease

front 65

A female employee complains that there are not separate toilets for the 20 women working on the site. She further states that all 160 employees use the same toilet. She said that the contractor is not complying with OSHA. According to the text, the employee

back 65

Does not have a valid complaint since OSHA has no specific instructions as to male and female toilets. The project is only required to have four toilets and four urinals

front 66

Employees shall not be exposed to noise levels exceeding _______________ dBA for more than eight hours a day.

back 66

90

front 67

A Class A fire consists of burning.

back 67

Wood

front 68

Portable electric lighting used in wet and/or other conductive locations shall be operated at _______________ volts or less.

back 68

12

front 69

_______________ shall not be used if the rope shows other signs of excessive wear, corrosion, or defect.

back 69

Wire rope

front 70

According to OSHA, a sign lettered in legible red letters, not less than 6 inches high on a white field is used only as a/an _______________ sign.

back 70

Exit

front 71

Material stored inside building under construction shall not be placed within _______________ feet of any hoistway opening or inside floor openings.

back 71

6

front 72

Scaffold planks shall extend over the centerline of its supports at least _______________ inches and not more than _______________ inches.

back 72

6; 12

front 73

A gap or void 2 inches or more in its least dimension in a floor, roof, or other walking/working surface is a

back 73

Hole

front 74

Safety and health regulation for construction, the minimum diameter wire ropes used in personnel hoists shall be _______________ inch.

back 74

1⁄2

front 75

An electric power circular saw shall be

back 75

Equipped with constant pressure switch

front 76

For general cleaning operations, the compressed air shall be reduced to less than _________ psi.

back 76

30

front 77

For powder-actuated tools, fasteners shall be allowed to be driven into

back 77

None of the above

front 78

Sloping or benching for excavation more than _______________ feet deep shall be designed by a registered professional engineer.

back 78

20

front 79

Stairway railings shall be capable of withstanding a minimum force of _______________ pounds applied in any downward or outward direction at any point along the top edge.

back 79

200

front 80

Forms and shores in concrete shall not be removed until

back 80

The concrete has gained sufficient strength to support its weight and superimposed loads

front 81

When ropes are used to define controlled access zones, the rope shall have a minimum breaking strength of _______________ pounds.

back 81

200

front 82

Excavations 8' or less in depth in Type A soil that have unsupported, vertically sided lower portions, shall have a maximum vertical side of _______________ feet.

back 82

3.5

front 83

All the following are true concerning OSHA regulations about employees working over or near water except

back 83

At least one person certified in lifesaving swimming courses shall be employed at all times

front 84

_______________ shall be located and determined prior to opening an excavation.

back 84

Underground installations

front 85

The maximum intended load for a frame scaffold including its components is 1,000 pounds. The scaffold as described shall be designed to support a minimum of _______________ ton(s).

back 85

2.0

front 86

Storing masonry blocks in stacks higher than 6 feet shall be permissible provided that

back 86

The stack is tapered back one-half block per tier above the 6-foot level

front 87

When hazardous waste cleanup and removal operations at any site take longer than _______________ months to complete, the employer shall provide showers and changing rooms for employees exposed to such conditions.

back 87

6

front 88

No employee shall be exposed to lead at concentrations greater than _______________ micrograms per cubic meter of air in an 8-hour period.

back 88

50

front 89

Training for Class II asbestos removal work requires hands-on training and shall take at least _______________ hours.

back 89

8

front 90

Where oxygen deficiency (atmospheres containing less than 19.5 percent oxygen) or a hazardous atmosphere exists or could reasonably be expected to exist, such as in excavations in landfill areas or excavations in areas where hazardous substances are stored nearby, excavations deeper than _______________ feet shall be tested before employees are allowed enter the excavation site.

back 90

4

front 91

Whenever a masonry wall is being constructed, a limited access zone shall be established. The access zone shall run the entire length of the wall, on the side of the wall that is not scaffolded and extend to the height of the wall to be

back 91

Reconstructed plus four feet

front 92

An employer shall ensure that no employee is exposed to an airborne concentration of asbestos in excess of _______________ fiber(s) per cubic centimeter of air as averaged over a 30-minute sampling period.

back 92

1.0

front 93

A wire core manila rope is used as a lifeline where it may be subjected to cutting or abrasion. The required minimum size of the rope shall be _______________ inch.

back 93

7/8

front 94

Routine inspection of open excavations shall be conducted by a competent person

back 94

Daily

front 95

Haulage vehicles, whose payload is loaded by means of cranes, power shovels, loaders, or similar equipment, shall have

back 95

A cab shield and/or canopy adequate to protect the operator from shifting or falling materials

front 96

When removing hazardous waste materials, personal protection equipment is divided into four categories based upon protection required. _______________ has the highest level of respiratory protection but a lesser level of skin protection.

back 96

Level B

front 97

Fuel gas and oxygen manifolds shall NOT be placed

back 97

They shall not be located within enclosed areas

front 98

The term "point of operation" refers to the

back 98

Area on a machine where work is actually performed\

front 99

For excavation made in Type C soil, the minimum, above the top of the vertical side, that the support shield systems at the vertically sided lower portion of an excavation be shielded or supported shall be _______________ inches.

back 99

18

front 100

The highest stack allowed when bricks are being stored shall be _______________ feet.

back 100

7

front 101

Employees shall be provided with anti-laser eye protection devices when working in areas in which a potential exposure to reflected laser light is greater than _______________ milliwatts.

back 101

5

front 102

The minimum illumination required for first aid stations shall be _______________ foot-candles.

back 102

30

front 103

A job site having 90 employees with temporary restrooms shall have a minimum of _______________ toilets and urinals.

back 103

Three toilets and three urinals

front 104

Employees shall be protected from excavated or other materials or equipment that could pose a hazard by falling or rolling into excavations. The minimum distance required from the edge of excavations for placing and keeping such materials or equipment is _______________ feet.

back 104

2

front 105

Not more than _______________ gallons of Category 4 flammable liquids shall be stored in any one storage cabinet.

back 105

120

front 106

A hand-held grinder with a 2-1/8" diameter wheel shall be equipped with only a

back 106

Momentary contact on/off switch

front 107

Each end of a scaffold platform, unless cleated or otherwise restrained, shall extend over the centerline
of its support at least _______________ inches.

back 107

6

front 108

Where scaffold platforms are overlapped to create a long platform, platforms shall be secured from movement or overlapped at least _______________ inches unless the platforms are nailed together or
otherwise restrained to prevent movement.

back 108

12

front 109

When lifting concrete slabs, operation of jacks shall be synchronized in such a manner as to insure even and uniform lifting of the slab. All points of the slab support shall be kept level within _______________ inches.

back 109

1/2

front 110

A "Controlled Access Zone" is implemented to protect employees from access to an area where the erection of precast concrete members is being performed. The control lines in a "Controlled Access Zone" shall be erected not more than _______________ feet from the unprotected or leading edge or half of the length of the member being erected, whichever is less.

back 110

60

front 111

Shoring for concrete shall be designed by a

back 111

Qualified designer

front 112

All masonry walls over _______________ feet in height shall be adequately braced to prevent overturning
and to prevent collapse unless the wall is adequately supported so that it will not overturn or collapse.

back 112

8

front 113

Self-supporting portable ladders shall be capable of supporting without failure at least _______________ times the maximum intended load.

back 113

4

front 114

A non-self-supporting ladder has a working length of 20'. According to OSHA, the horizontal distance from the top support to the foot of the ladder is approximately_______________ decontamination area.

back 114

5

front 115

During asbestos removal, the asbestos disposal contractor shall erect _______________ foot/feet.

back 115

3

front 116

All pneumatic nailers, staplers and other similar equipment provided with automatic fastener feed shall have a safety device to prevent the tool from ejecting fasteners when operation pressures exceed _______________ psi.

back 116

100

front 117

A portable ladder that is NOT self-supporting must be capable of supports at least _______________ times the maximum intended load.

back 117

4

front 118

The common drinking cup is

back 118

Prohibited

front 119

Eye protection near dangerous working conditions

back 119

Is required at the employer's cost

front 120

During construction, the minimum illumination required for an indoor warehouse shall be _______________ foot- candles.

back 120

5

front 121

When safety nets are required to be provided, such nets shall extend _______________ feet beyond the edge of the work's surface.

back 121

8

front 122

The mesh size of safety nets shall not exceed

back 122

6" x 6"

front 123

When masonry blocks are stacked higher than _______________ feet, the stack shall be tapered back one-half block per tier above the six-foot level.

back 123

6

front 124

Lumber that is handled manually shall not be stacked more than _______________ feet high.

back 124

16

front 125

The components of a scaffold loaded with 500 pounds shall be capable of supporting its own weight and a load of at least ton(s) without failure.

back 125

1

front 126

All site clearing equipment shall be equipped with an overhead and rear canopy guard of at least 1/8" steel plate or _______________ inch woven wire mesh with openings no greater than one inch, or equivalent.

back 126

1/4

front 127

Where doors or gates open directly on a stairway, a platform shall be provided, and the swing of the door shall not reduce the effective width of the platform to less than _______________ inches.

back 127

20

front 128

Cohesive soil packed with an unconfined compressive strength of less than 1.5 tons per square foot but greater than .5 tons per square foot is defined as

back 128

Туре В

front 129

A six-foot deep trench excavated in Type C soil shall have the sides sloped at a maximum of

back 129

1 1⁄2 : 1

front 130

A simple slope excavation with a depth of 10 feet and which will be open for 20 hours shall have a
maximum allowable slope of _______________ in Type A soil.

back 130

1⁄2 : 1

front 131

When Type C soil is excavated over Type A soil, Type A soil shall be excavated to a maximum slope of _______________ in layered soils.

back 131

3⁄4 : 1

front 132

Lifting inserts that are embedded, or otherwise attached to precast concrete members, other than the tilt-up members, shall be capable of supporting at least _______________ times the intended maximum load.

back 132

4

front 133

The maximum number of manually controlled jacks allowed for lift-slab construction operations shall be limited to _______________ on one slab.

back 133

14

front 134

The approximate angle of repose for sloping the sides of an excavation, less than 20' deep, in sand shall be

back 134

34°

front 135

When excavating in the proximity of adjoining buildings, a general contractor shall _______________ safety and protection of workers.

back 135

Provide adequate shoring and bracing systems

front 136

When single post shores are tiered, they shall

back 136

Be vertically aligned

front 137

When erecting systems-engineered metal buildings, during placing of rigid frame members, the load is not to be released from the hoisting equipment until

back 137

The members are secured with not less than 50% of the required bolts at each connection

front 138

Prior to site layout, the contractor shall

back 138

Locate surface encumbrances that may pose a hazard to employees

front 139

Drawings or plans, including all revisions, for concrete formwork (including shoring equipment) shall
be available at the

back 139

Jobsite

front 140

Shoring for supported concrete slabs shall be removed only when the contractor

back 140

Determines that the concrete has gained sufficient strength to support its weight and superimposed loads

front 141

Where electrical transmission lines are energized and rated at least 50 kV or less, a minimum clearance distance of _______________ feet shall be maintained.

back 141

10

front 142

When debris is dropped through a hole in the floor without the use of chute, the drop area shall be enclosed with barricades measuring a minimum of _______________ inches.

back 142

42

front 143

_______________ require "point of operation guarding."

back 143

Guillotine cutters

front 144

A _______________ scaffold has an adjustable platform mounted on an independent support frame and is equipped with a means to permit platform raising or lowering.

back 144

Masons' adjustable supported

front 145

At more than _______________ feet above a lower level, the tubular welded frame scaffolding shall have approved guardrails and toe boards at all open sides and ends.

back 145

10

front 146

A minimum of _______________ bolts shall be in place at each structural steel beam connection during final placing of solid web members before the load is released.

back 146

Two

front 147

The maximum allowable height, without being retrained from tipping, for a free-standing mobile scaffold tower that has a base width of 4 feet is _______________ feet.

back 147

16

front 148

The minimum plywood thickness required for an overhead protective covering above a material or personnel hoist cage is _______________ inch(es).

back 148

3⁄4

front 149

The maximum permissible span for a 2" x 9" full thickness undressed lumber scaffold plank, when used for a light duty rated load is _______________ feet.

back 149

10

front 150

The maximum intended load on a float or ship scaffold shall be _______________ lbs.

back 150

750

front 151

Which of the following is true about electric power-operated tools furnished by the contractor,

back 151

Each tool shall be double insulated or grounded

front 152

A _______________ is an accidental failure of a cross brace in an excavation.

back 152

Kickout

front 153

The maximum permissible span for 1 4 x 9-inch full thickness wood plank having a maximum intended load of 50 pounds per square foot is _______________ feet.

back 153

4

front 154

The minimum breaking strength for vertical lifelines used for fall protection shall bes _______________ pounds.

back 154

5,000

front 155

_______________ gauge U.S. standard wire is used for the screen between the toe boards and top rails of an approved guardrail system.

back 155

No. 18

front 156

A ground fault circuit interrupter, GFCI, which is not a part of the permanent wiring of the building on a construction site, protects the_______________

back 156

Personnel

front 157

rsonnel D. Wiring
157. The maximum opening size permitted in the 1/4" woven wire mesh, used as a rear canopy guard on rider-operated equipment, when used for site clearing shall be_______________ inch.

back 157

1

front 158

When a contractor discovers a piece of machinery on site which is not in compliance with OSHA requirements the contractor should

back 158

Physically remove the machinery from the site

front 159

A general contractor is building an apartment building with two exterior balconies. The general contractor and the carpentry subcontractor sign an agreement where the carpentry subcontractors will provide all temporary railings. There are 3 other subcontractors and their employees working on the site, using the balconies, when an OSHA inspector arrived and found the railing to be inadequate and unsafe. Which of the following represents the most likely outcome of this inspection visit?

back 159

The general contractor and all subcontractors on site will be fined the full amount

front 160

Of the following, which is not a true statement per OSHA regulations?

back 160

Jobsite first-aid kits shall be checked by the employer daily

front 161

According to OSHA, a hazardous atmosphere containing less than _______________ percent oxygen may exist in deep excavations.

back 161

19.5

front 162

Which of the following is a true statement concerning OSHA regulations?

back 162

Manually stacked lumber piles shall not be more than 16 feet in height

front 163

Employers shall not issue or permit the use of unsafe hand tools. Which of the following tools is considered unsafe?

back 163

  • A drift pin with a mushroomed head
  • A splintered wooden handled shovel
  • A pipe wrench with a sprung jaw

front 164

Powder-actuated tools shall be tested _______________ to insure proper working condition.

back 164

A. Every hour of each day in use
B. Each day before loading
C. One per week
D. After a malfunction occurs

front 165

"Asbestos containing material" is any material that contains _______________ asbestos.

back 165

More than one percent

front 166

Guarding for use with belts, gears, shafts, pulleys, drums, fly wheels or other power operated tools with reciprocating, rotating or moving parts should meet the requirements of

back 166

American National Standards Institute

front 167

In excavations where a trench shield system is installed, the maximum depth of earth material that can be excavated below the bottom of the shield is _______________ inches.

back 167

Not more than 24

front 168

In accordance with OSHA, the _______________ has the responsibility of being safe, conducting activities safely and in accordance with all applicable laws and rules.

back 168

Employer

front 169

The minimum number of sanitation facilities (chemical toilets) required for a 10-person mobile crew having transportation readily available to nearby toilet facilities is_______________

back 169

Zero

front 170

_______________ soil, which looks and feels damp, can easily be shaped into a ball and rolled into small diameter threads before crumbling.

back 170

Moist

front 171

Inspections of alloy steel chains when used for rigging equipment for material handling shall occur

back 171

Annually

front 172

Concrete mixers with _______________ or larger loading skips shall be equipped with guardrails installed on each side of the skip.

back 172

One cubic yard

front 173

A dry chemical, sodium or potassium bicarbonate-based fire extinguisher operated by cartridge is ranked as a type _______________ extinguisher.

back 173

B and C only

front 174

When using control lines to demarcate controlled decking zones, non-mandatory guidelines require that each line be rigged and supported in such a way that its highest point is not more than _______________ inches from the working surface.

back 174

45

front 175

A powder-operated tool shall be tested

back 175

Each day before loading

front 176

A room used for storage of more than 60 gallons of flammable or combustible liquids shall have at least one portable fire extinguisher, having a rating of not less than 20-B units, shall be located outside of, but nor more thane _______________ feet from the door opening into the room.

back 176

7

front 177

The maximum number of people that can use a ladder jack scaffold at the same time is

back 177

2

front 178

Guardrail systems shall be designed capable of withstanding a force of at least _______________ pounds.

back 178

200

front 179

Toeboards are required on scaffolding more than _______________ feet in height.

back 179

10

front 180

All pneumatically driven nailers provided with automatic fastener feed, which operate at more than 100 psi pressure at the tool shall have a

back 180

Safety device installed at the muzzle

front 181

When using a hand-tool that is not grounded, the user should make sure the tool is

back 181

Double insulated

front 182

Each employee on a scaffold more than _______________ feet above a lower level must be protected from falling to that lower level.

back 182

10

front 183

Scaffolding cannot be moved with employees still on it unless the surface on which it is moving is within _______________ degrees of level.

back 183

3

front 184

Material chutes at an angle of more than 45° from the horizontal shall have openings not to exceed _______________ inches in height.

back 184

48

front 185

When it is not practical to use nails to secure roof bracket scaffolds, brackets shall be secured in place with first-grade manila rope of at least _______________ inch(es).

back 185

3⁄4

front 186

The warning line erected around all sides of the roof work area shall not be less than _______________ feet from the roof edge when mechanical equipment is not being used.

back 186

6

front 187

On low-sloped roofs of _______________ feet or less in width, the use of a safety monitoring system alone as a means of providing fall protection during roofing operation is permitted.

back 187

50